CertLiner

Certification process

How a system, a contractor and a crew lead earn and keep certification.

Every route follows the same principles: evidence against a published scheme, evaluation by qualified assessors, a decision by someone independent of the evaluation, and ongoing surveillance in the field.

For manufacturers

System Certification

Covers one complete system (tube or spray material, resin, catalyst and cure method) over a declared diameter, thickness and application range: gravity, pressure or potable.

Time to certificate

Depends on the level of certification required. Contact us for more information.

  1. 1

    Application and scope

    Define the system's components, cure method, diameter and thickness range, and intended service.

  2. 2

    Technical file review

    Design basis, material specifications, installation handbook and existing test data, checked against the relevant ASTM, ISO and AWWA standards.

  3. 3

    Formulation fingerprint

    The resin formulation and its IR spectrum are deposited in confidence, so any field sample can be matched to the certified recipe.

  4. 4

    Type testing

    Short- and long-term structural properties, watertightness and chemical resistance, tested at a recognised ISO/IEC 17025 laboratory.

  5. 5

    Factory audit

    Production control, incoming material checks, batch traceability and storage are audited on site.

  6. 6

    Independent decision and listing

    A reviewer who took no part in the evaluation decides. The certificate and its scope are published in the registry.

  7. ↻

    Surveillance

    Annual factory audit, random product sampling, and re-evaluation before any change to the formulation, materials or process.

For installers

Contractor Certification

Granted per certified system and technique, such as UV-cured CIPP, steam-cured CIPP, laterals or SIPP. A contractor is certified for what it actually installs.

You will need

  • A documented quality-control plan
  • Named, qualified crew leads
  • Calibrated cure-monitoring equipment
  • Records of recent installations
  1. 1

    Application per system and technique

    Choose the certified systems you install, with the system holder's confirmation of training.

  2. 2

    Office audit

    QC plan, procedures, installation records, equipment and calibration, personnel, and control of subcontractors.

  3. 3

    Witnessed installation

    An assessor attends a live job: host-pipe preparation, wet-out or mixing, insertion, the cure record, reinstatement and sampling.

  4. 4

    Independent decision and listing

    Certificate issued with its scope. The registry lists your certified systems, techniques and crew leads.

  5. ↻

    Surveillance

    Annual audit, unannounced site visits, job registration and site-sample results. Renewed once a year.

For Crews

Personnel Certification

Until Personnel Certification opens, crew leads are qualified and named inside each contractor certificate.

Eligibility

Logged installations by technique, signed off by a certified contractor.

Examination

A written exam on standards, cure science and QC, plus a practical assessment.

Renewal

Continuing education and current installation activity.

Site verification

The liner in the ground is checked against the system on paper.

Contractors register certified jobs. A share is randomly selected for a witnessed sample, so every crew knows any job could be checked.

  1. 1

    Job registered

    Location, system, crew lead and dates.

  2. 2

    Random selection

    The sampling rate rises for a contractor with past findings.

  3. 3

    Witnessed sample

    Taken, sealed and labelled with chain of custody.

  4. 4

    Accredited testing

    At a recognised lab of the contractor's choice.

  5. 5

    Compared and recorded

    Against certified values and the IR fingerprint; shown in the registry.

Every year, aggregated results are published as a benchmark of certified systems and contractors.

If something goes wrong

A published, proportionate sanctions ladder.

  1. Observation

    Improvement noted and checked at the next audit.

  2. Nonconformity

    Corrective action plan required; extra site samples.

  3. Suspension

    Registry status changes; no new certified work until resolved.

Every decision can be appealed to a panel independent of the original decision.