Certification process
Every route follows the same principles: evidence against a published scheme, evaluation by qualified assessors, a decision by someone independent of the evaluation, and ongoing surveillance in the field.
For manufacturers
Covers one complete system (tube or spray material, resin, catalyst and cure method) over a declared diameter, thickness and application range: gravity, pressure or potable.
Time to certificate
Depends on the level of certification required. Contact us for more information.
Define the system's components, cure method, diameter and thickness range, and intended service.
Design basis, material specifications, installation handbook and existing test data, checked against the relevant ASTM, ISO and AWWA standards.
The resin formulation and its IR spectrum are deposited in confidence, so any field sample can be matched to the certified recipe.
Short- and long-term structural properties, watertightness and chemical resistance, tested at a recognised ISO/IEC 17025 laboratory.
Production control, incoming material checks, batch traceability and storage are audited on site.
A reviewer who took no part in the evaluation decides. The certificate and its scope are published in the registry.
Annual factory audit, random product sampling, and re-evaluation before any change to the formulation, materials or process.
For installers
Granted per certified system and technique, such as UV-cured CIPP, steam-cured CIPP, laterals or SIPP. A contractor is certified for what it actually installs.
You will need
Choose the certified systems you install, with the system holder's confirmation of training.
QC plan, procedures, installation records, equipment and calibration, personnel, and control of subcontractors.
An assessor attends a live job: host-pipe preparation, wet-out or mixing, insertion, the cure record, reinstatement and sampling.
Certificate issued with its scope. The registry lists your certified systems, techniques and crew leads.
Annual audit, unannounced site visits, job registration and site-sample results. Renewed once a year.
For Crews
Until Personnel Certification opens, crew leads are qualified and named inside each contractor certificate.
Logged installations by technique, signed off by a certified contractor.
A written exam on standards, cure science and QC, plus a practical assessment.
Continuing education and current installation activity.
Site verification
Contractors register certified jobs. A share is randomly selected for a witnessed sample, so every crew knows any job could be checked.
Location, system, crew lead and dates.
The sampling rate rises for a contractor with past findings.
Taken, sealed and labelled with chain of custody.
At a recognised lab of the contractor's choice.
Against certified values and the IR fingerprint; shown in the registry.
Every year, aggregated results are published as a benchmark of certified systems and contractors.
If something goes wrong
Improvement noted and checked at the next audit.
Corrective action plan required; extra site samples.
Registry status changes; no new certified work until resolved.
Every decision can be appealed to a panel independent of the original decision.